Plinth Protection

Before arranging the floor, professionals provide cure at the top surface of the amalgamated earth within the plinth walls & also safeguard that back filling against groundwork is preserved to its full deepness. Backfilled earth on each side of all erected up walls, which will be in instantaneous contact with the base, will be treated with water base chemical elucidation at perpendicular surface of the infrastructure, to a depth of 45cm and width of 15cm. The chemical shall be absorbed towards the building materials surfaces so that earth in connection with these planes is well treated with the biochemical. At this stage a ring of chemical barricade will be delivered at external perimeter of the site by burrowing hovels at equal interims & pouring chemical solution there in. This would give power to the building to battle termite from incoming the properties through outward soil.